Electricity
Page Content FIRST SCHEDULE TO THE ELECTRICITY SUPPLY BYLAWS
EFFECTIVE FROM 1 AUGUST 1998
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| 1. |
A connection fee, subject to Section 2(3) of the Electricity Bylaws: (a) For connections equipped with a single phase electricity dispenser, where supply is via a single span from a pole outside the property, the supply mains are of overhead construction, and where the electricity is to be purchased on a Scale 9 or Scale 11 energy tariff of the Second Schedule: |
|
|
|
| |
(i) With a small power distribution unit |
R307,02 |
R42,98 |
R350,00 |
| |
(ii) Without a small power distribution unit |
R219,30 |
R30,70 |
R250,00 |
| |
Applicants of this category of connection shall be issued with, and will have a choice of, a hotplate, a standard kettle and a standard iron (as approved by the Engineer), or an electricity token for R50,00.
NOTE 1: The Engineer may for technical reasons decide to use underground cable.
NOTE 2: Where a connection already exists at a premises, and additional service mains are required, then this item shall only apply to the provision of an additional connection at the discretion of the Engineer.
(b) For connections other than to those referred to in Item 1(a), a charge consisting of a Basic component, a Service Mains component, a Metering component, and a Supply Mains component:
(i) A Basic component as follows:
A. Where a single phase supply is via a single span of overhead cable from a pole outside the property to a single-phase meter, and the supply mains are of overhead construction: |
R2627,19 |
R367,18 |
R2995,00 |
| |
B. Where the service mains are underground cable: I. For single phase connections at 230V up to 80A:
II. Deleted
III. Deleted |
R3197,37 |
R447,63 |
R3645,00 |
IV. For 400V connections
up to 80A
81A to 100A
151A to 200A (140kVA)
201A to 250A (175kVA)
251A to 300A (205kVA)
301A to 350A (240kVA)
351A to 400A (275kVA)
401A to 450A (315kVA)
451A to 800A (500kVA)
801A to 1200A (800kVA)
1201 to 1600A (1000kVA)
1601 to 2400A (1600kVA)
2401 to 3200A (2000kVA) |
R6114,04
R6820,18
R22149,12
R27688,60
R33223,68
R37973,68
R43508,77
R49837,72
R54561,40
R66153,51
R72574,56
R132307,02
R145149,12 |
R855,96
R954,82
R3100,88
R3876,40
R4651,32
R5316,32
R6091,23
R6977,28
R7638,60
R9261,49
R10160,44
R18522,98
R20320,88 |
R6970,00
R7775,00
R25250,00
R31565,00
R37875,00
R43290,00
R49600,00
R56815,00
R62200,00
R75415,00
R82735,00
R150830,00
R165470,00 |
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| |
NOTE: Where requested by the Engineer, customers are required to provide brick substations to the Engineer's specification. Minisubstations up to a requested capacity of 500kVA may be supplied at the Engineers discretion. Where the Engineer requires the applicant to provide a substation to feed or from which it is intended to feed other customers, a reduction shall be applied to the Basic component of the connection charge as follows: |
|
|
|
| |
Provision of accommodation for a brick substation: |
R5000,00 |
R700,00 |
R5700,00 |
| |
Provision of additional accommodation for a distributor substation: |
R10000,00 |
R1400,00 |
R11400,00 |
| |
V. For 11 000V connections, where the requested capacity exceeds 1000 kVA and up to 6 000 kVA: A cost per connection of: |
R96710,53 |
R13539,47 |
R110250,00 |
|
A cost per MVA of requested capacity of: |
R43771,93 |
R6128,07 |
R49900,00 |
Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| |
VI. For 11 000V and 33 000V connections where requested capacity exceeds 6 000kVA and 18 000kVA respectively: The proportionate costs as determined by the Engineer at prevailing rates, for: HV supply main extension; the required 11000V switchpanels at the major substation; 11000V switchgear at the customers premises, and any other costs as deemed appropriate by the Engineer, is charged.
VII. For 132 000V connections where capacity exceeds 18000kVA:
The proportionate costs as determined by the Engineer at prevailing rates, for:
132 000V switchpanels at the 275kV/132kV substation;
132 000V switchgear installed at the customers premises, and any other costs as deemed appropriate by the Engineer, is charged. |
|
|
|
| |
(ii) A Metering component as follows: A. For each Single phase electricity dispenser up to 60A: |
R590,00 |
R82,60 |
R672,60 |
| |
Additional cost for a small power distribution unit to be supplied with the meter: |
R377,27 |
R52,82 |
R430,09 |
| |
B. I. For each Single phase credit meter, up to 80A: |
R359,65 |
R50,35 |
R410,00 |
| |
II. For each single phase Two-Rate credit meter, up to 80A: |
R399,12 |
R58,88 |
R455,50 |
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| |
III. For each Three phase meter to connections up to 150A: |
R1 057,02 |
R147,98 |
R147,98 |
| |
IV. For each Three phase Two-Rate meter to connections up to 150A: |
R1 403,51 |
R196,49 |
R1 600,00 |
| |
V. For a Three phase meter to connections requiring current transformers: |
R1 315,79 |
R184,21 |
R1 500,00 |
| |
VI. For each three phaseTwo-Rate meter to connections requiring current transformers: |
R1 666,67 |
R233,33 |
R1 900,00 |
| |
VII. For each three phase energy and demand meter suitable for a Bulk Supply Agreement tariff: |
R4 078,95 |
R571,05 |
R4 650,00 |
| |
(iii) A Service Mains component as follows: A. For all underground 230V connections up to 80A, within a township where a Developer has paid for the Supply Mains: A charge per connection of:
A charge for any dedicated cables from the point on the boundary of the property closest to the consumer distribution unit. |
R557,02 |
R77,98 |
R635,00 |
| |
B. For all underground 230V connections up to 80A, where a developer has not paid for the Supply Mains: A charge for any dedicated cables from the point on the boundary of the property closest to the consumer distribution unit. |
|
|
|
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| |
C. For all other connections other than underground 230V connections up to 80A, for any dedicated cables or lines, charged according to rates in Item 2 of this schedule. |
|
|
|
| |
(iv) A Supply Mains component, for any supply mains, cables and lines, charged according to rates in Item 2 of this schedule unless a R/kVA km is specified: A. For all 230V or 400V connections up to 150A (100kVA):
LV supply mains extensions, excluding crossovers, in excess of 20 metres per customer if fed by cable, or 1 span per customer if fed by overhead line, costed according to the installation that would have been sufficient for the requested capacity.
A proportionate share of the cost of MV supply mains extensions in excess of 200 metres per substation for a requested capacity up to 150A according to the ratio of requested capacity to the total capacity that the Engineer envisages supplying from that extension; |
|
|
|
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| |
B. For all 400V connections from 151A up to 1 600A
(1 000kVA):
LV supply mains extensions, excluding crossovers, costed according to the installation that would have been sufficient for the requested capacity.
A proportionate share of the cost of MV supply mains extensions excluding the first 50 metres of cable per substation laid in the road reserve or public property, according to the ratio of requested capacity to the total capacity that the Engineer envisages supplying from that extension;
C. For 11 000V connections, where requested capacity exceeds 1000 kVA and is less than 6 000 kVA:
A R/kVA km cost for MV supply mains based upon the requested capacity and the length of the MV route from the source 132kV/11kV substation, of: |
R42,98 |
R6,02 |
R49,00 |
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| |
D. For 11 000V and 33 000V connections where requested capacity exceeds
6 000kVA and 18000kVA respectively:
I. A guaranteed contribution towards the proportionate cost of any 132 000V supply mains extension, such guaranteed contribution to be reduced to zero in ten equal amounts for each year in which the capacity is utilised above the minimum agreed level. The contribution is to be recovered from the consumer if, in the Engineer's opinion, the requested capacity is utilised below the agreed level;
II. A charge equal to the product of: a Rand/kVAï ¿ ½ km rate determined by the Engineer using actual costs, the length of the 11000V or 33000V supply mains from the source 132kV/11kV or 132kV/33kV substation, and the requested capacity. |
|
|
|
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| |
E. For 132 000V connections where capacity exceeds 18000kVA: A charge equal to the product of: a Rand/kVAï ¿ ½ km rate determined by the Engineer using actual costs, the length of 132000kV supply mains from the source 275kV/132kV substation or 132kV switchyard, and the requested capacity. |
|
|
|
| |
NOTE 1: Where the application is for a supply within a development and the cost of the supply mains have been paid for by the developer according to a signed agreement, only the Service Mains and Metering components are charged. NOTE 2: Where the Engineer has agreed to supply additional service mains to provide supply to a second connection, and where the premises have not been allocated as an informal settlement, only the Service Mains and Metering components are charged.
NOTE 3: Where the application is for a connection to be supplied from a meter room and the cost of the supply has been paid by a previous applicant, only the Metering component is charged. |
|
|
|
| 2. |
Supply mains and service mains installations and extensions: (a) Cable shall be charged for in accordance with the following scale: |
|
|
|
(i) Cables with a standard operating voltage not exceeding 1 000V:
| CROSS SECTIONAL AREA OF CONDUCTORS SQ. MM |
NUMBER OF CORES |
CONDUCTOR |
RATE PER METRE |
| BASIC TARIFF |
14% VAT |
TOTAL TARIFF |
| 10 16
25
25
35
16
25
25
35
35
50
50
95
95
150
150
240
240
185
280
400
600 |
2
2
2
2
2
4
4
4
4
4
4
4
4
4
4
4
4
4
1
1
1
1 |
copper
copper
copper
aluminium
aluminium
copper
copper
aluminium
copper
aluminium
copper
aluminium
copper
aluminium
copper
aluminium
copper
aluminium
copper
aluminium
copper
aluminium |
R 39,47
R 42,54
R 50,00
R 42,54
R 50,00
R 51,75
R 54,39
R 53,51
R 64,91
R 56,14
R 76,32
R 57,89
R 93,86
R 76,32
R153,51
R100,88
R311,40
R162,28
R 76,32
R 76,32
R120,18
R120,18 |
R 5,53
R 5,96
R 7,00
R 5,96
R 7,00
R 7,25
R 7,61
R 7,49
R 9,09
R 7,86
R10,68
R 8,10
R13,14
R10,68
R21,49
R14,12
R43,60
R22,72
R10,68
R10,68
R16,83
R16,83 |
R 45,00
R 48,50
R 57,00
R 48,50
R 57,00
R 59,00
R 62,00
R 61,00
R 74,00
R 64,00
R 87,00
R 66,00
R107,00
R 87,00
R175,00
R115,00
R355,00
R185,00
R 87,00
R 87,00
R137,00
R137,00 |
NOTE : These costs are also applied when deriving costs of Low Voltage Busbar and insulator conductor.
(ii) Cables with a standard voltage exceeding 1 000V but not exceeding 11 000V
| CROSS SECTIONAL AREA OF CONDUCTORS SQ. MM |
NUMBER OF CORES |
CONDUCTOR |
RATE PER METRE |
| BASIC TARIFF |
14% VAT |
TOTAL TARIFF |
| 50 95
95
150
150
240
70 XLPE |
3
3
3
3
3
3
3 |
copper
copper
aluminium
copper
aluminium
aluminium
copper |
R126,32
R142,98
R126,32
R194,74
R145,26
R201,75
R171,05 |
R17,68
R20,02
R17,68
R27,26
R20,34
R28,25
R23,95 |
R144,00
R163,00
R144,00
R222,00
R165,60
R230,00
R195,00 |
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| |
(iii) Pilot/Telephone cables - rate per metre: |
R 52,63 |
R 52,63 |
R 60,00 |
| |
(iv) Other types and sizes of cables or conductor specified by the Engineer as being suitable for the service, which are not included in (i), (ii) and (iii) above, shall be paid for at a rate equal to the actual cost of supply and installation. (v) Where an overhead service main is authorised by the Engineer, the aerial cable used shall be charged for in accordance with the above scales, less 30 percent. |
|
|
|
| |
(b) Overhead lines shall be charged in accordance with the following scale:
|
|
|
|
(i) Per pole and span of overhead lines:
| VOLTAGE LEVEL |
TYPE/SIZE OF CONDUCTOR |
RATE PER POLE OR SPAN |
| BASIC TARIFF |
14% VAT |
TOTAL TARIFF |
| LV |
10mm CC /m
16mm CC /m
Pole (LV CC)
25mm ABC /m
50mm ABC /m
95mm ABC /m
Pole (LV ABC) |
R6,43 R9,50
R956,14
R4,76
R13,14
R26,20
R1913,16 |
R0,86 R10,83
R133,86
R0,67
R1,84
R3,67
R267,84 |
R7,33 R20,33
R1090,00
R5,43
R14,98
R29,87
R2181,00 |
| MV |
95mm ABC /m
Pole (MV ABC)
AAAC Oak /m
AAAC Pine/ m
Pole (MV AAAC) |
R75,05
R3149,12
R12,03
R22,07
R2862,28 |
R10,51
R440,88
R1,68
R3,09
R400,72 |
R85,56
R3590,00
R13,71
R25,16
R3263,00 |
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| |
(ii) Other types and sizes of overhead supply specified by the Engineer as being suitable for the service, which is not included in (i) above, shall be paid for at a rate equal to the actual cost of supply and installation. |
|
|
|
| 3. |
Inspection and testing of a residential electrical installation: |
R434,21 |
R60,79 |
R495,00 |
| 4. 5.
6.
7.
8.
9. |
Removed.
Removed.
Removed.
Removed.
Removed.
Removed. |
|
|
|
| 10. |
Testing of meters:
(a) kWh meters per test:
(i) Single phase supply: |
R107,89 |
R15,11 |
R123,00 |
| |
(ii) Poly phase supply: |
R153,51 |
R21,49 |
R175,00 |
| |
(b) Energy plus demand (bulk) meters per test (Polyphase supply): |
R578,95 |
R81,05 |
R660,00 |
| 11. |
11. Reconnection: (a) Where disconnected at the consumer's request or for non-payment of account or in consequence of a breach of the Bylaws, per connection: |
R72,37 |
R10,13 |
R82,50 |
| |
(b) Where disconnected at the request of the consumer to enable him to effect extensions, repairs or maintenance to his house or to allow an electrical contractor to reposition meter box without extension to, or cutting of, the service main: |
Nil |
Nil |
Nil |
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| |
(c) Where overhead mains are temporarily disconnected and coiled back, on request, for the carrying out of fumigation or similar services: |
R280,70 |
R39,30 |
R320,00 |
| |
(d) Where disconnected for a second time as a result of unauthorised reconnection; or where disconnected as a result of illegal bypassing of meter: |
R719,30 |
R100,70 |
R820,00 |
| 12. |
Provision of metering pulses, monthly charge: |
R28,95 |
R4,05 |
R33,00 |
| 13. |
Temporary single phase supplies for periods not exceeding 14 days (for fetes, religious gatherings, elections, etc.): Per supply point, including consumption: |
R399,12 |
R55,88 |
R455,50 |
| |
For single phase supplies per amp of supply provided, including consumption: |
R4,56 |
R0,63 |
R5,20 |
| |
Plus per amp per day: |
R1,32 |
R0,18 |
R1,50 |
| |
For three phase supplies per amp of supply provided, including consumption: |
R9,65 |
R1,65 |
R11,00 |
| |
Plus per amp per day: |
R2,81 |
R0,39 |
R3,20 |
| 14. |
Provision of Load Profile Recording Data: (a) Where the period of recording is not in excess of seven days: |
R622,81 |
R67,19 |
R710,00 |
| |
(b) For each subsequent week or portion thereof: |
R26,32 |
R3,68 |
R30,00 |
| |
(c) Where a suitable Time-Of-Use meter is installed, per month or part thereof: |
R28,95 |
R4,05 |
R33,00 |
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| 15. |
Change of, or extension to, tariffs necessitating addition or change of meter, time switch or time settings: (a) Installation of a single phase credit meter, up to 80A: |
R359,65 |
R50,35 |
R410,00 |
| |
(b) Installation of a three phase meter to connections up to 150A: |
R1 057,02 |
R147,98 |
R1 205,00 |
| |
(c) Poly phase supply: |
R 964,91 |
R135,09 |
R1 100,00 |
| |
(d) Installation of a three phase Two-Rate meter to connections up to 150A: |
R1 403,51 |
R196,49 |
R1 600,00 |
| |
(e) Installation of a three phase meter to connections requiring a current transformer: |
R1 315,79 |
R184,21 |
R1 500,00 |
| |
(f) Installation of a three phase Two-Rate meter to connections requiring a current transformer: |
R1 666,67 |
R233,33 |
R1 900,00 |
| |
(g) Installation of a three phase energy and demand meter suitable for a Bulk Supply Agreement tariff: |
R4 078,95 |
R571,05 |
R4 650,00 |
| |
(h) Removal of meter: |
Nil |
Nil |
Nil |
| |
(i) Time switch or time switching setting: |
Nil |
Nil |
Nil |
| |
(j) Installation of a night or weekend demand meter: |
R328,95 |
R46,05 |
R375,00 |
| |
(k) Replacement of current transformers: |
R263,16 |
R38,84 |
R300,00 |
| 16. |
Transfer to or from a tariff where supply is via an Electricity Dispenser: (a) Transfer from Scale (9 or 11) to Scale (4 or 1): |
R3 657,90 |
R512,11 |
R4 170,01 |
| Item No. |
Description |
Basic Tariff |
14% VAT |
Total Tariff |
| |
(b) Transfer from Scale (4 or 1) to Scale (8 or 10): |
R590,00 |
R82,60 |
R672,60 |
| |
(c) Transfer from Scale (9 or 11) to Scale (8 or 10): |
R3 429,83 |
R480,18 |
R3 910,01 |
| |
(d) Transfer from Scale (8 or 10) to Scale (4 or 1): plus a Service mains and Supply Mains component calculated according to Item 1(b)(iii) and (iv).
The above transfers are subject to the Engineer's approval and to the payment of deposits where necessary. Refer to Sections 2(3), 8(5), 13(1) and 13A(1) of the Electricity Bylaws. |
R359,65 |
R50,35 |
R410,00 |
| 17. |
Relocation of meter: (a) Relocation of a Scale 9 connection meter: |
R219,3 |
R30,70 |
R250,00 |
| |
(b) Relocation of the meter of an underground supply to a position on the boundary determined by the Engineer: |
R576,95 |
R81,05 |
R660,00 |
| |
(c) Relocation of a meter within a meter room Where the meter position is moved to a position other than to that determined by the Engineer, the cost of the additional cable required shall be charged for according to Item 2. |
R131,58 |
R18.42 |
R150,00 |
SECOND SCHEDULE TO THE ELECTRICITY SUPPLY BYLAWS
Electricity supplied by the Council shall be charged for at the following tariff of rates:
| Item No |
Description |
Basic Tariff |
Tariff inclusive of
VAT |
| 1. |
Scale 1: Business and general
(1) Charge per kilowatt hour |
29,4519c |
33,5752c |
| |
(2) Monthly service charge per consumer for each connection supplied |
R42,15 |
R48,05 |
| |
(3) Percentage rebate on kilowatt hour charge where supply voltage is greater than 1 000 V |
|
2% |
| 2. |
Scale 2: Two rate tariff (1) Charges per kilowatt hours |
10,9488c |
12,4816c |
| |
Surcharge per kilowatt hour consumed from 07: 00 to 20: 00, Monday to Friday |
26,0407c |
29,6864c |
| |
(2) Monthly service charge per consumer for each connection supplied |
R42,15 |
R48,05 |
| |
(3) Percentage rebate on kilowatt hour charge where supply voltage is greater than 1 000 V |
|
2% |
| 3. |
Scale 3: Residential premises - polyphase supply (1) Charge per kilowatt hour |
23,9125c |
27,2603c |
| 4. |
Scale 4: Residential premises - single phase supply (1) Charge per kilowatt hour |
23,9125c |
27,2603c |
| 5. |
Scale 5: Business Cooking (1) Charges per kilowatt hour |
25,6822c |
29,2777c |
| |
(2) Monthly service charge per consumer for each connection supplied |
R42,15 |
R48,05 |
| 6. |
Scale 6 and 7: Industrial heating, water heating and pumping purposes (1) Charges per kilowatt hour: Period of interruption of supply - three hours per day, Monday to Friday |
18,7197c |
21,3405c |
| Item No |
Description |
Basic Tariff |
Tariff inclusive of
VAT |
| |
Period of interruption of supply - six hours per day, Monday to Friday |
16,4332c |
18,7338c |
| |
(2) Minimum monthly charge per kilowatt of installed capacity |
R19,7900 |
R22,5606 |
| |
Subject to a minimum payment of |
R63,37 |
R72,24 |
| |
(3) Monthly service charge per consumer for each connection supplied |
R42,15 |
R48,05 |
| 7. |
Scale 8: Residential premises - small power users with electricity dispenser where the cost of connection is paid in advance Service connection fee paid for, in accordance with item 1(c)(i) to (ii) or else converted to Scale 8 according to item 16 of the First Schedule. (1) Cost per kWh payable in advance |
23,91c |
27,26c |
| 8. |
Scale 9: Residential premises - small power users with electricity dispenser where the cost of connection is recovered via the units tariff A service connection fee paid in accordance with item 1(b)(a) or (b) of the First Schedule.
(1) Cost per kWh payable in advance |
30,27c |
34,51c |
| 9. |
Scale 10: Business and general - equipped with electricity dispenser (single phase) A service connection fee paid for, in accordance with Item 1(c)(i) or (ii) or else converted to Scale 10 according to Item 16 of the First Schedule.
(1) Charge per kilowatt hour |
30,58c |
34,86c |
| |
(2) Monthly service charge per consumer for each connection supplied (MN 293/90; 407/90; 312/90; 125/93; 227/93; M.N208/94; 156/94; 159/96) |
Nil |
Nil |
| 10. |
Scale 11: Business and general - equipped with electricity dispenser (single phase) where the cost of the connection is recovered via the units tariff A service connection fee paid for, in accordance with Item 1(b)(i) or else converted to Scale 11 according to Item 16 of the First Schedule.
(1) Charge per kilowatt hour
(M.N. 155/96) |
36,94c |
42,11c |
| Item No |
Description |
Basic Tariff |
Tariff inclusive of
VAT |
| |
(2) Monthly service charge per consumer for each connection supplied |
Nil |
Nil |
| 11. |
Small Power Users: (Interim tariff applicable to Tongaat Customers) (1) Charge per kilowatt hour 1st 500 units |
38,5020c |
43,8923c |
| |
Over 500 units |
22,2528c |
25,3682c |
| 12. |
Large Power Users : (Interim tariff applicable to Tongaat Customers) (1) Demand Charge At 400V |
R41,26 |
R47,04/kVA |
| |
11 000V |
R39,62 |
R45,17/kVA |
| |
(2) Energy Charge per kilowatt hour |
7,6162c |
8,6825c |
| |
Subject to a maximum cents/kWh charge of |
35,1506c |
40,0717c |
| |
(3) Transmission Surcharge |
1% |
|
Notes to Scales
1. Scale 1: Business and General
(1) This scale shall apply to electrical energy supplied for:
(a) business premises (such as shops, factories, hostels, boarding houses, restaurants, office buildings, residential buildings in which individual units are not separately metered) and religious buildings;
(b) illumination of outdoor sports grounds, external illumination of buildings, illuminated signs, advertisements or lamps used solely for external decorative purposes;
(c) motive power, heating and other industrial purposes, including builders' temporary supplies;
(d) any other purposes for which no lower scale in these tariffs is prescribed.
(2) The nominal pressure of supply under this scale is 230 volts single phase 230/400V, three phase; four wire; 555 V three phase; 6 600 V three phase; 11 000 V, three phase; 33 000V, three phase; 132 000V, three phase.
The nominal alternating current frequency is 50Hz.
(3) No service charge will be made in respect of religious buildings.
2. Scale 2: Two rate tariff
(1) This scale shall be available only as an alternative to consumers who in terms of these bylaws would otherwise be supplied under Scale 1.
(2) The supply of electricity under this Scale is subject to the installation of a time switch and a two rate metering device.
3. Scales 3 and 4: Residential premises
These scales shall apply to electrical energy supplied to:
(1) residential premises;
(2) flat or maisonettes used solely for residential purposes or any premises used as such which are individually metered;
(3) servants' quarters in premises used for flats or maisonettes if such servants' quarters are individually metered;
(4) non-profit making residential establishments operated by welfare organisations as defined by the National Welfare Act, 1978;
(5) public lighting in blocks of flats and other residential buildings.
4. Scale 5: Business cooking
This scale is available only to Scale 5 connections existing as at 31 December 1997 and shall apply to electrical energy supplied for:
(1) electric cooking in business premises, such as hotels, boarding houses, restaurants, tea rooms, residential chambers, including residential units in which the current used in individual units is not separately metered;
(2) operating associated electrical kitchen appliances installed in addition to an electrical cooking service.
The decision of the Engineer as to whether current may be supplied under this tariff scale will be final.
5. Scales 6 and 7: Industrial heating, water heating and pumping purposes
(1) These scales are only applicable to Scale 6 or 7 connections existing as at 31 December 1997 and shall apply to electrical energy supplied for purposes such as industrial heating, water heating, battery charging and pumping purposes at off peak hours as determined by the Engineer.
(2) The supply of electricity under these scales is subject to the following special conditions;
(a) The consumer's main switch must embody a "no volt" release approved by the Engineer.
(b) The supply of electricity will be subject to interruption daily, Monday to Friday during the peak load period or periods on the Council's supply system as determined by the Engineer. The hours during which the supply will be interrupted will be notified to the consumer in writing by the Engineer, who shall give one month's notice of any change in these hours. The total duration of the daily interruption/s of supply will not exceed 3 hours in the case of Scale 6 and 6 hours in the case of Scale 7.
(c) The installation of a time switch or other load control device.
6. Scales 8 and 9: Residential premises
These scales shall apply to electrical energy supplied to:
(1) small power residential premises;
(2) flats or maisonettes used for residential purposes which are individually metered or any premises used as such;
(3) servants' quarters in premises used for flats or maisonettes if such servants' quarters are individually metered;
(4) non-profit making residential establishments operated by welfare organisations as defined by the National Welfare Act, 1978;
(5) religious buildings, schools and crà ¨ ches;
equipped with an electricity dispenser (single phase).
7. Scale 10 and 11: Business and General
These scales shall apply to electrical energy supplied for:
(1) business or general premises (such as shops, factories, hostels, boarding houses, restaurants, office buildings and residential buildings in which individual units are not separately metered);
(2) public lighting in blocks of flats and other residential buildings;
(3) illumination of outdoor sports grounds, external illumination of buildings, illuminated signs, advertisements or lamps used solely for external decorative purposes;
(4) motive power, heating and other industrial purposes, including builders' temporary supplies;
(5) any purpose of which no lower scale in these tariffs is prescribed;
where supply is at 230 volts, is single phase and is metered using an electricity dispenser.
(M.N 293/90; 312/91; 227/93; 208/94; M.N. 156/95; 155/96)
Last Revision Service No. 2/99
|